+++ to secure your transactions use the Bitcoin Mixer Service +++

 

 

ContentPhoto GalleryNewsSite map

Jiangyin Suspension Bridge

Bridging the Yangtze

The timely completion of Jiangyin Bridge confirmed Cleveland Bridge�s reputation in long span bridge construction.  Its completion was timed to mark the 50th Anniversary of the Revolution on 1st October 1997 and was opened by President Jiang Zhemin.

The bridge is the most seaward crossing of the Yangtze River carrying a dual three lane highway over the river with 50m navigational clearance.   Jiangyin Bridge has a main span of 1385m main span - the longest in China until completion of Runyang South in 2005. 


Jiangyin Bridge, China

Cleveland Bridge was main contractor for construction of the suspension system and main span deck. 

Cleveland was given 850 days to engineer, manufacture, construct and complete the work.  Working together with the Client, the Engineer, Chinese sub-contractors and offshore suppliers Cleveland Bridge was responsible for ensuring completion on time.

Cleveland Bridge�s own staff undertook all the construction engineering, procurement in UK and world-wide, the fabrication, and supervision by  the assembly and construction on site.

 

 

 

Suspension Bridges