Actualités en direct des projets (non traduites)
Nouvelles en VO
ODLK1 - Electrical work 3
- Détails
This means that battery power supply cannot handle 7 hours of power failure, so I need to program that the server shot down automatically before 9:00 to preserve it.
It need to be manually power on and this could be done at 19:00.
Sorry for the problems.
Thanks
Source
Ralph@home - New application: RoseTTAFold All-Atom
- Détails
Source
NFS@home - BOINC Pentathlon - Thank you!
- Détails
Source
ODLK - The ODLK project is 7 years old!
- Détails
Happy birthday!
Source
Yafu - Aliquot sequence 2912730 has terminated!!!
- Détails
Source
ODLK1 - Electrical work 2
- Détails
On 16/05/2024 from 9:00 to 13:00 there is no electrical power in the area again, so no connection to server (power supply should be able to carry the 4h of power off and still run the server, but without connection to internet).
Thanks
Source